Supporting Local Youth through Outdoor and Residential Activities

We're looking to redevelop our BP building, which has been in place for a number of years now, but is becoming in need of replacement. This page show the potential designs and ideas for how a replacement building might look and furthermore, how it might benefit our users.

New Building Concept

The building will be designed to hold around 70 people for residential experiences. The building will be able to be divided into two separate user groups of around 35 in each, split upstairs and downstairs (although an alternative could be to split the building into two vertically with each taking half of the two floor space) 

There will be a communal entrance area encompassing a boot room, stairs and a lift for access to the first floor.

The main hall will include an indoor Climbing Wall with automatic belay safety systems.

The building will be protected internally by a fire alarm and security alarm system with CCTV around the perimeter.

Each floor should consist of the following:

  • Hall
  • Kitchen
  • Dining area
  • Toilets
  • Individual cubicle showers
  • Bunk rooms divided up into rooms of 4-6 people.

The first floor will also include a warden's flat which will include a living area, bathroom and bedroom, enabling a member of staff to stay onsite during busy periods to assist with running of the site and / or providing programme activities for users fo the facilities.

Plan View (from Road side)
Plan View (from Road side)

Plan View

  • Showing the overall footprint of the building
Floorplan   Ground Floor.PNG

Floor Plan - Ground Floor

Floorplan   Ground Floor.PNG
Floorplan   First Floor.PNG
Floorplan   First Floor.PNG

Floor Plan - First Floor

Front Elevation

Front Elevation (close up)

  • Outdoor decking area
Front Elevation
External View (from Drive side)
External View (from Drive side)

Front Elevation (from drive side)

  • Outdoor decking area
  • Entrance to RHS (car park side)
Front Elevation (from Lodge Park side of lawn)

Front Elevation (from Lodge Park side)

  • Outdoor Toilet block 
  • Decking area
Front Elevation (from Lodge Park side of lawn)
Entrance side Elevation (car park side)
Entrance side Elevation (car park side)

Side Elevation (from Car Park)

  • Main Entrance
  • Ability to share facilities from one entrance
  • Accessible from sloped access from car park
Rear side elevation

Rear Side View

  • Plant Room (and / or climbing store)
Rear side elevation
6 Bed Dormitory

Dormitory Room

  • 3 x Bunk Beds
6 Bed Dormitory
Leader / Staff Bunk Room (4 beds)
Leader / Staff Bunk Room (4 beds)

Leader / Staff Bunk Room

  • 2 x Bunk Beds
Ground Floor Main Hall and Climbing Wall

Ground Floor Main Hall

  • Feature Climbing Wall
  • Double doors opening onto Decking Area
  • Optional dividing wall
Ground Floor Main Hall and Climbing Wall
Ground Floor Large Hall Kitchen
Ground Floor Large Hall Kitchen

Ground Floor Kitchen

First Floor Main Hall

First Floor Main Hall

First Floor Main Hall
First Floor Dining Room
First Floor Dining Room

First Floor Dining Room

First Floor Landing

First Floor Landing

First Floor Landing
First Floor Landing (looking out)
First Floor Landing (looking out)

First Floor Landing (looking out)

Corridor

Corridor

Corridor
Wardens Flat Living Space
Wardens Flat Living Space

Warden's Flat - Living Area

Wardens Flat Bedroom

Warden's Flat - Bedroom

Wardens Flat Bedroom
Wardens Flat - Bathroom
Wardens Flat - Bathroom

Warden's Flat - Bathroom

© Humberside Scouts 2024. Registered Charity No. 524674 An indicoll website
Privacy PolicyCookie PolicyAccessibilityDisclaimer